The products passed inspection. The shipment still failed.
A U.S. refrigeration equipment distributor received a shipment of glass doors with transportation damage. Around 40 cartons out of 280 showed varying degrees of damage after arrival.
The factory believed the products had passed inspection. The customer believed the factory should take responsibility. For two months, both sides argued over who was at fault.
The direct product loss was limited. The real loss was delayed customer deliveries, replacement shipments, management time and declining trust between customer and supplier.